APPLICATION CYCLES
FLOOR PREPARATION
FLOOR PREPARATION CYCLES
ON CONCRETE SCREED LAYED ON SLAB
FLOOR PREPARATION CYCLE

The preparation of a concrete substrate requires careful preliminary checks as specified in our Professional Training Courses. The following is the preparation cycle necessary for coating a cement screed in resin that does not present any humidity, such as when a floor laid on a slab.

FASE 1 • Verification and preparation of the support

Before starting, make sure that there is no humidity. Carefully verify that the surface is properly prepared and is in the condition indicated in our Professional Training Courses.

• Day 1

FASE 2 • Primer application

R101_PRIMER_CEMENTO_ErreLab

R101 CEMENT PRIMER (A+B)

Roller application of transparent water-based epoxy primer for absorbent substrates.

Product: R101 CEMENT PRIMER  (A+B)
Dilution: 100% Water
Tool: Medium hair nylon roller
Pot-life a 25°: 105 minutes
Overlay time at 25°: 4 hours
Indicative consumption: 0,10 Kg/m2

FASE 3 • Mortar primer application

R211 MALTA (A+B+C)

Water-based epoxy mortar casting application. Consumption varies according to the conditions of the existing substrate. After drying, sand
with abrasive discs with a grain of 36 to 120 (depending on the effect).

Product: R211 MALTA (A+B+C)
Dilution: Ready to use
Tool: Sawtooth trowel (mm 6×6)
Pot-life at 25°: 15 minutes
Overlay time at 25°: 24 hours
Indicative consumption: 1,50 Kg/m2

• End cycle

PRODUCTS USED

R101_PRIMER_CEMENTO_ErreLab

R101 CEMENT PRIMER (A+B)

Breathable bi-component anchor formulated with water-based epoxy resins. Primer for all absorbent surfaces.

Mixture/weight ratio: A=600 B=400
Consumption:
Variable
Pot-life: 105 min
Colour:

R211 MALTA (A+B+C)

Semi-self-leveling, tri-component, water-based epoxy mortar for base coatings on floors. Supplied in white color.

Mixture/weight ratio: A=220 B=113 C=667
Consumption:
Variable
Pot-life: 15 min
Colour:

CONCRETE SCREED LAYED ON GROUND
FLOOR PREPARATION CYCLE

The preparation of a concrete substrate requires careful preliminary checks as specified in our Professional Training Courses. The following is the preparation cycle necessary to coat a cementitious screed laid on an embankment in resin which may be damp.

FASE 1 • Verification and preparation of the support

Before the intervention, evaluate the level of humidity in the substrate. Carry out an accurate verification of the surface on which you are going to work and adequate preparation respecting what is specified in our Professional Training Courses.

• Day 1

FASE 2 • Primer application

R101_PRIMER_CEMENTO_ErreLab

R101 PRIMER CEMENTO (A+B)

Roller application of transparent water-based epoxy primer for absorbent substrates.
In this particular case, the next step can be applied with the “FRESCO SU FRESCO” system.

Product: R101  CEMENT PRIMER (A+B)
Diluizione: 300% Water
Tool: Medium brush nylon roller
Pot-life at 25°: 105 minutes
Overlay time at 25°: 0 hours
Indicative consumption: 0,05 Kg/m²

FASE 3 • Substrate preparation

R203_ERRE_BLOCK_ErreLab

R203 ERRE-BLOCK (A+B+C)

Application with trowel of a layer of connection to the cement surface with the function of a vapor barrier.
Apply in adequate quantity. Before proceeding with the next phase, always check the humidity level.

Prodotto: R203 ERRE-BLOCK (A+B-C)
Diluizione: Pronto uso
Attrezzo: Frattone americano acciaio
Pot-life a 25°: 90 minuti
Tempo sovrapplicazione a 25°: 24-36 ore
Consumo indicativo: 0,70 Kg/m²

• Day 2

FASE 4 • Substrate preparation

R203_ERRE_BLOCK_ErreLab

R203 ERRE-BLOCK (A+B+C)

Application with trowel of a second layer of connection to the surface with vapor barrier function.
Apply in adequate quantity. Before proceeding with the next phase, always check the humidity level.

Product: R203 ERRE-BLOCK (A+B-C)
Dilution: Ready to use
Tool: American steel trowel
Pot-life at 25°: 90 minutes
Overlap time at 25°: 24-36 hours
Indicative consumption: 0,70 Kg/m²

• Day 3

FASE 5 • Primer mortar application

R211 MALTA (A+B+C)

Water-based epoxy mortar casting application. Consumption varies according to the conditions of the existing substrate. Once dry, sand with 36 to 120 grit abrasive discs (depending on the effect).

Product: R211 MALTA (A+B+C)
Dilution: Ready to use
Tool: Sawtooth trowel (mm 6×6)
Pot-life at 25°: 15 minutes
Overlap time at 25°: 24 hours
Indicative consumption: 1,50 Kg/m²

• End cycle

PRODUCTS USED

R101_PRIMER_CEMENTO_ErreLab

R101 CEMENT PRIMER (A+B)

Breathable bi-component anchor formulated with water-based epoxy resins. Primer for all absorbent surfaces.

Mixture/weight ratio: A=600 B=400
Consumption:
Variable
Pot-life: 105 min
Colour:

R203_ERRE_BLOCK_ErreLab

R203 ERRE-BLOCK (A+B-C)

Tri-component formulation (A + B + C) based on liquid epoxy resins in aqueous emulsion and hydraulic binders, used as a base for wet surfaces. Particularly resistant to moisture in counter thrust.

Mixture/weight ratio: A=300 B=200 C=500
Consumption: 0,4-1,0 kg/m² (per coat)
Pot-life: 45 min
Colour:

R211 MALTA (A+B+C)

Semi-self-leveling, tri-component, water-based epoxy mortar for base coatings on floors. Available in white color.

Mixture/weight ratio: A=220 B=113 C=667
Consumption:
Variabile
Pot-life: 15 min
Colour:

TILES LAYED ON SLAB
FLOOR PREPARATION CYCLE

The preparation of a tiled floor requires, depending on the different type (narrow, medium or wide grout), careful preliminary checks as specified in our Professional Training Courses. The following is the preparation cycle necessary to coat a tiled surface in resin that does not show any rising damp, as in the case of a tile floor laid on a slab.

FASE 1 • Verification and preparation of the support

Before the intervention, evaluate that there is no rising damp. Carefully verify the surface on which you are going to work and adequate mechanical treatment respecting the specifications
in our Professional Training Courses.

• Day 1

FASE 2 • Substrate preparation

R202_FONDO_FIBRE_ErreLab

R202 FIBRE BASE (A+B+C)

Coated application of a reinforced base layer for the regularization of the surface of the tiles and
joint saturation.

Product: R202 FIBER BASE (A+B+C)
Dilution: Ready to use
Tool: American steel trowel
Pot-life at 25°: 30 minutes
Overlay time at 25°: 24 hours
Indicative consumption: 1 Kg/m²

• Day 2

FASE 3 • Primer application

R101_PRIMER_CEMENTO_ErreLab

R101 CEMENT PRIMER (A+B)

Roller application of transparent water-based epoxy primer for absorbent substrates.

Product: R101CEMENT PRIMER  (A+B)
Dilution: 100% Water
Tool: Medium brush nylon roller
Pot-life at 25°: 105 minutes
Overlap time at 25°: 4 hours
Indicative consumption: 0,10 Kg/m²

FASE 4 • Mortar primer application

R211 MALTA (A+B+C)

Water-based epoxy mortar casting application. Consumption varies according to the conditions of the existing substrate. After drying, sand
with 36 to 120 grain abrasive discs (depending on the desired effect).

Product: R211 MALTA (A+B+C)
Dilution: Ready to use
Tool: Sawtooth trowel (mm 6×6)
Pot-life at 25°: 15 minutes
Overlap tie at 25°: 24 hours
Indicative consumption: 1,50 Kg/m2

• End of the cycle

PRODUCTS USED

R101_PRIMER_CEMENTO_ErreLab

R101  CEMENT PRIMER (A+B)

Breathable bi-component anchor formulated with water-based epoxy resins. Primer for all absorbent surfaces.

Mixture/weight ratio: A=600 B=400
Consumption:
Variable
Pot-life: 105 min
Colour:

R202_FONDO_FIBRE_ErreLab

R202 FONDO FIBRE (A+B+C)

Semi-self-leveling, tri-component, water-based epoxy mortar for base coatings on floors. Availalble in white.

Mixture/weight ratio: A=390 B=110 C=500
Consumption: 1 kg/m²
Pot-life: 30 min
Colour:

R211 MALTA (A+B+C)

Semi-self-leveling, tri-component, water-based epoxy mortar for base coatings on floors. Supplied in white color.

Mixture/weight: A=220 B=113 C=667
Consumption:
Variable
Pot-life: 15 min
Colour:

TILES PLACED ON THE GROUND
FLOOR PREPARATION CYCLE

The preparation of a tiled floor requires, according to the type (narrow, medium or wide grout), careful preliminary checks as specified in our Professional Training Courses. The following is the preparation cycle necessary to coat a tiled surface laid on an embankment in resin which may have a rising damp.

FASE 1 • Verification and preparation of the support

Before starting, evaluate the level of humidity in the substrate. Carefully verify the surface on which you are going to work and that the mechanical treatment adequately respects what is specified in the
our Professional Training Courses.

• Day 1

FASE 1 • Substrate preparation

R203_ERRE_BLOCK_ErreLab

R203 ERRE-BLOCK (A+B+C)

Application with a trowel with one layer of connection to the cement surface with the function of a vapor barrier.
Apply in adequate quantity. Before proceeding with the next phase, always check the humidity level.

Product: R203 ERRE-BLOCK (A+B-C)
Dilution: Ready to use
Tool: American steel trowel
Pot-life at 25°: 90 minutes
Overlay time at 25°: 24-36 hours
Indicative consumption: 1,20 Kg/m²

• Day 2

FASE 2 • Substrate preparation

R203_ERRE_BLOCK_ErreLab

R203 ERRE-BLOCK (A+B+C)

Application with a trowel with a second layer of connection to the surface with vapor barrier function.
Apply in adequate quantity. Before proceeding with the next phase, always check the humidity level.

Product: R203 ERRE-BLOCK (A+B-C)
Dilution: Ready to use
Tool: American steel trowel
Pot-life at 25°: 90 minutes
Overlay time at 25°: 24-36 hours
Indicative consumption: 0,70 Kg/m²

• Day 3

FASE 3 • Mortar primer application

R211 MALTA (A+B+C)

Water-based epoxy mortar casting application. Consumption varies according to the conditions of the existing substrate. Once dry, sand with 36 to 120 grit abrasive discs (depending on the desired effect).

Prodotto: R211 MALTA (A+B+C)
Dilution: Ready to use
Tool: Sawtooth trowel (mm 6×6)
Pot-life at 25°: 15 minutes
Overlay time at 25°: 24 hours
Indicative consumption: 2,50 Kg/m²

• End cycle

PRODUCTS USED

R203_ERRE_BLOCK_ErreLab

R203 ERRE-BLOCK (A+B-C)

Tri-component formula (A + B + C) based on liquid epoxy resins in aqueous emulsion and hydraulic binders, used as a base for wet surfaces. Particularly resistant to moisture in counter thrust.

Mixture/weight ratio: A=300 B=200 C=500
Consumption: 0,4-1,0 kg/m² (per hand)
Pot-life: 45 min
Colour:

R211 MALTA (A+B+C)

Semi-self-leveling, tri-component, water-based epoxy mortar for base coatings on floors. Available in white.

Mixture/weight ratio: A=220 B=113 C=667
Consumption:
Variable
Pot-life: 15 min
Colour: